AMI CUSTOMS
10-15-2009, 03:00 AM
Alright,
We are going to tackle this on the weekend. I have done one of these already, helped out(Farred) put his AMS widemouth pipe on a few months back, so I know of the headaches to come, but that has been awhile. Pointers from you that have done this, things you can remember to help speed the process up and keep from breaking bolts. I already got the top heat sheild off and one other bolt on top that looks to hold another heat sheild on, it was a 12 mm bolt, I can feel two other 12 mm bolts under the dp, is that it and then that sheild is off and the dp can come off? I also removed the 2 10mm bolts that hold the bracket over the CV joint.
We will be doing this with jack stands and will have air tools, but don't think they will help any due to limited space. Any pointer, shout them out.
If you are wondering, UR ceramic coated dp from(ryanowarrior) that is what is going in, plus I have the AMS front motor mount so I am not worried about welds cracking on the pipe, despite how weak they appear, there should be very limited movement on that pipe due to the front motor mount.
Also thought about collecting all and any good information from this thread and making a step by step how to.
We are going to tackle this on the weekend. I have done one of these already, helped out(Farred) put his AMS widemouth pipe on a few months back, so I know of the headaches to come, but that has been awhile. Pointers from you that have done this, things you can remember to help speed the process up and keep from breaking bolts. I already got the top heat sheild off and one other bolt on top that looks to hold another heat sheild on, it was a 12 mm bolt, I can feel two other 12 mm bolts under the dp, is that it and then that sheild is off and the dp can come off? I also removed the 2 10mm bolts that hold the bracket over the CV joint.
We will be doing this with jack stands and will have air tools, but don't think they will help any due to limited space. Any pointer, shout them out.
If you are wondering, UR ceramic coated dp from(ryanowarrior) that is what is going in, plus I have the AMS front motor mount so I am not worried about welds cracking on the pipe, despite how weak they appear, there should be very limited movement on that pipe due to the front motor mount.
Also thought about collecting all and any good information from this thread and making a step by step how to.